Q 1(a) — Fundamentals of Estimating
Data Requirements & Importance of Estimating — Asked 8×
Years: 2024S, 2023S, 2022F, 2021S, 2021F, 2020F, 2018F, 2017S
Methods of Taking Out Quantities — Asked 5×
Years: 2024S, 2023S, 2019S, 2018S, 2014S
Types / Classification of Estimates — Asked 4×
Years: 2016S, 2015S, 2015F, 2014F
Requirements of an Estimate — Asked 3×
Years: 2018S, 2016F (repeated), 2016S
Characteristics of Estimating — Asked 2×
Years: 2021F, 2017F
Q 1(b) — Rate Analysis & Material Calculations
Prepare Rate Analysis for Sanitary Items — Asked 12×
- Wash Basin complete set: 2024S, 2023F, 2022F, 2021F, 2020F, 2019F, 2018F, 2016F
- W.C. Commode with cistern: 2021S, 2020S, 2020F, 2019S
Factors Affecting Rate Analysis — Asked 7×
Years: 2024S, 2022F, 2021F, 2019S, 2018F, 2018S, 2016S
Define / Explain Rate Analysis & Necessity — Asked 6×
Years: 2023F, 2020F, 2018F, 2016S, 2016F, 2015S
Calculate Material Quantities — Asked 5×
- Brick masonry with openings: 2024S, 2022F, 2021F, 2019F
- Plastering work: 2024S, 2021F, 2019F, 2017F
- Concrete work: 2021S, 2018S
- Reinforcement bars: 2018S
Q 2(a) — Preliminary Estimate
Preliminary Estimate by Plinth Area Method — Asked 14× (Every Year)
Years: 2024S, 2023S, 2023F, 2022F, 2021F, 2021S, 2020S, 2020F, 2019S, 2018F, 2017S, 2016S, 2016F, 2015F, 2015S, 2014S
Standard Components to Include:
- Carpet area given → calculate built-up area (add circulation 20–40%)
- Wall area (usually 8–10% of built-up area)
- Plinth area = Built-up area + Wall area
- Base cost = Plinth area × Plinth area rate
- + Water supply & sanitary (6–13% of building cost)
- + Electrical work (8–12% of building cost)
- + Architectural treatment (0.5–3% of building cost)
- + Deeper foundation (1–1.5% of building cost)
- + Contingencies (2.5–5% of total)
- + Supervision charges (5–10% of total)
Preliminary Estimate by Cubic Content Method — Asked 3×
Years: 2023F, 2021F, 2017S
Q 2(b) — Specification Writing
Detailed Specification for Specific Works — Asked 13×
- Brick work in cement mortar: 2023F, 2021S, 2019F, 2017S, 2016F, 2015F
- R.C.C. work (M20/1:2:4): 2022F, 2021S, 2019S, 2018S, 2015S, 2015F
- P.C.C. work: 2020S
General Specification for Road / Bituminous Work — Asked 3×
Years: 2019S, 2019F, 2016S
Specification for Plastering Works — Asked 2×
Years: 2017S, 2016F (repeated)
Q 3(a) — Earthwork in Road Construction
Calculate Earthwork in Cutting & Filling (Hill Road) — Asked 15× (Appears Every Year)
Years: 2024S, 2023S, 2023F, 2022F, 2021F, 2021S, 2020S, 2019S, 2019F, 2018F, 2017S, 2017F, 2016S, 2016F, 2015F, 2015S, 2014F, 2014S
Key Components:
- Formation width (typically 7–11 m)
- Side slopes in cutting (1:1 or 1.5:1)
- Side slopes in banking/filling (2:1 or 1.5:1)
- Cross slope of ground (varies 6:1 to 15:1)
- RL of ground level and formation level given
- Depth of cutting / height of banking at different chainages
- Use graphical method or Prismoidal formula
Cost Estimate of Earthwork — Asked 2×
Years: 2023F, 2021S
Q 3(b) — Unit of Measurement & Mode of Payment
Tabulate Unit of Measurement & Payment for 5 Items — Asked 8×
Years: 2023F, 2022F, 2021F, 2020F, 2019F, 2018F, 2017F, 2016F
Most Frequently Asked Items:
- Honey comb brick wall / Brick coping (5×)
- C.G.I. sheet roofing (5×)
- Cement pointing work (4×)
- Marble skirting / Wooden skirting (4×)
- Centering & shuttering for R.C.C. (3×)
- Distempering / Emulsion painting (3×)
- Door & window frames/shutters (3×)
- Excavation work (2×)
- Reinforcement bars (2×)
How Items Are Measured (Description) — Asked 3×
Years: 2015S, 2014S, 2014F
Q 4(a) — Detailed Quantity Estimates — Structural Works
Estimate from Slab Culvert Drawing — Asked 7×
Years: 2024S, 2021S, 2019S, 2018S, 2018F, 2017F, 2014S
Standard Items to Estimate:
- Earthwork in excavation
- 1st class brickwork in (1:6) cement mortar
- R.C.C. slab (1:2:4)
- Reinforcement bars
- Cement pointing (1:1)
- Wearing coat
Estimate from Aqueduct / Minor Drawing — Asked 3×
Years: 2023F, 2020S, 2016S
Estimate from T-Beam Decking Drawing — Asked 2×
Years: 2023S, 2015S
Q 4(b) — Additional Rate Analysis / Specifications
Rate Analysis for Road Works — Asked 5×
- Double coat surface dressing: 2014S, 2014F
- Premix asphalt/carpet: 2023S, 2023F, 2022F
Rate Analysis for Brickwork / Concrete — Asked 5×
- 1st class brick work in cement mortar: 2016F, 2015F
- M20 concrete (1:1.5:3): 2017S, 2015S, 2015F
Define Specification Types — Asked 3×
Years: 2023F, 2022F, 2016F
Q 5(a) — Detailed Quantity Estimates — Building Works
Estimate from Building Drawing (2-Room / Single Room) — Asked 13×
Years: 2024S, 2022F, 2021F, 2020F, 2019S, 2019F, 2018S, 2018F, 2017F, 2017S, 2016S, 2016F, 2015F
Standard Items to Estimate:
- Earthwork in excavation in foundation
- P.C.C. (1:3:6 or 1:2:4) in foundation
- Brick work in (1:6) cement mortar in superstructure
- R.C.C. work in slab / lintel / footing
- Doors & windows frame and shutter
- Sand filling in floor (150 mm thick)
- Flat brick soling
- D.P.C. work
- Plastering work
Estimate from Framed Structure Drawing — Asked 3×
Years: 2024S, 2020S, 2017S
Q 5(b) — Septic Tank & Soak Pit Estimates
Estimate from Septic Tank & Soak Pit Drawing — Asked 7×
Years: 2022F, 2021F, 2019F, 2017S, 2015S, 2015F, 2014S
Standard Items to Estimate:
- Earthwork in excavation for septic tank and soak pit
- P.C.C. (1:3:6) in foundation
- Brick work in (1:4 or 1:6) cement mortar
- R.C.C. baffle wall / Precast R.C.C. slab
- Cement plaster (1:4)
- Sand filling in soak pit
- Brick aggregate filling
Q 6(a) — Valuation of Property
Valuation of Existing Building (Depreciation Method) — Asked 11×
Years: 2024S, 2023F, 2022F, 2021F, 2019S, 2019F, 2018S, 2018F, 2017F, 2016F (repeated)
Key Components:
- Plinth area of building given
- Plinth area rate (Rs. per sqm)
- Age of building & Life of building (typically 75–100 years)
- Rate of depreciation (rd = 1, 1.3, or 2%)
- Cost of land (Rs. per sqm) & Area of plot
- Sometimes distress value (60–80% of total value)
Valuation by Rental Method (Net Income Method) — Asked 5×
Years: 2022F, 2021F, 2020F, 2019F, 2015S
Key Components:
- Gross annual rent / income
- Various expenses (insurance, management, taxes, repairs)
- Net income = Gross income − Expenses
- Year's purchase calculation
- Future life of building
- Rate of interest and redemption of capital
Valuation of Cinema Theatre / Multiplex — Asked 3×
Years: 2023F, 2021F, 2020S
Valuation for Repairs (Economic Analysis) — Asked 2×
Years: 2023S, 2014S
Define Valuation / Circumstances / Factors & Methods — Asked 4× & 2×
Years: 2024S, 2018S, 2017S, 2014F | 2017S, 2014S
Q 6(b) — Specification & Contract Documents
Importance / Essential Part of Specification in Contract — Asked 9×
Years: 2023S, 2022F, 2021F, 2020F, 2019F, 2017F, 2016S, 2016F, 2015S
Points to Consider While Writing Specification — Asked 5×
Years: 2023S, 2020F, 2018S, 2016S, 2015F
Specification Writing Techniques — Asked 3×
Years: 2023F, 2021S, 2017S
Define Specification / Purpose / Types & Difference Between Spec and Drawings — Asked 3× & 2×
Years: 2021S, 2018S, 2018F | 2022F, 2021F
Q 7 — Short Notes (Any Two, 2 × 5 marks)
| Topic | Frequency | Years |
|---|---|---|
| Scrap Value & Obsolescence | 6× | Multiple |
| Specification Writing Techniques / Types of Specification | 6× | Multiple |
| Revised Estimate & Supplementary Estimate | 5× | 2023F, 2020F, etc. |
| General Specification for Sanitary / Water Supply Works | 4× | 2024S, 2021S, etc. |
| Annual Repair and Maintenance Estimate | 3× | 2017F, 2016F, etc. |
| Value and Cost / Book Value vs Market Value | 3× | 2016S, 2015S, etc. |
| Capitalized Value & Year's Purchase | 3× | 2017F, 2016F, 2014F |
| Methods of Estimate / Types of Estimate | 3× | 2019F, 2014F |
| Overhead and Contingencies / Contractor's Profit | 3× | 2015S, 2014S, 2014F |
| Earthwork Estimation in Road Works | 2× | 2018S, 2014S |
| Complete Estimate / Detailed Estimate | 2× | 2021F, 2019S |
| Abstracting BOQ (Bill of Quantities) | 1× | 2015F |
| General Specification for C.G.I. Sheet Roofing | 1× | 2023F |
| Importance of Estimating and Valuation | 1× | 2022F |
| Factors Affecting Rate Analysis | 1× | 2015F |
| Rental Method of Valuation / Profit Based Method | 1× | 2018F, 2014F |
Exam Preparation Strategy
Must-prepare topics that appear almost every year:
- Preliminary Estimate by Plinth Area Method — Q2(a)
- Earthwork in Cutting & Filling for Hill Road — Q3(a)
- Detailed Estimate from Building Drawing — Q5(a)
- Rate Analysis for Sanitary Items (Wash Basin / Commode) — Q1(b)
- Valuation of Existing Building by Depreciation Method — Q6(a)
- Detailed Specification for Brick / RCC Work — Q2(b)
- Estimate from Slab Culvert Drawing — Q4(a)
- Unit of Measurement & Payment Table — Q3(b)
Important Drawing Estimates to Practice
- Two-room building with foundation details
- Slab culvert (2.4 m to 2.7 m span)
- Septic tank and soak pit
- Framed structure building
- T-beam decking
- Aqueduct / Minor