Unit I: Introduction

Sanitation systems · sewerage systems · quantity of sewage & storm water · solid waste

1. [Fall 2022] What is the purpose of providing sanitation facilities? Compare the conservancy and water-carriage systems of sanitation, indicating the merits and demerits of each.

2. [Spring 2020] Describe the system of sanitation with its advantages and disadvantages. Why is the water-carriage system of sanitation more popular than the conservancy system? How do you collect and dispose of dry refuse in a rural area?

3. [Spring 2023] Define sanitation. Explain the various types of sanitation systems.

4. [Fall 2024] Explain the types of sanitation systems, highlighting their advantages and disadvantages.

5. [Spring 2021] At a sparsely-populated place, what type of sanitary system would you use, and why? What sewerage system would you use in a place with high rainfall intensity? Why?

6. [Fall 2021] Define sewage and sanitation. Compare the different systems of sanitation.

Also: Determine the design discharge for the combined system of a small town with a projected population of 50,000 residing over an area of 30 hectares. Rate of water supply = 130 lpcd; permeability factor = 0.55; time of concentration = 30 min. Assume suitable data if necessary.

7. [Spring 2021] Find the quantity of sewage for separate, combined and partially-separate systems for a catchment area of 300 hectares, tr = 3 min, tc = 16 min. Population density = 600 persons/hectare; rate of water supply = 135 lpcd. Assume other necessary data.

Surface data — Roof 5% (C=0.85); Pavement & Yard 25% (C=0.81); Lawn & Garden 30% (C=0.15); Road 20% (C=0.43); Vacant Plot 20% (C=0.12).

8. [Fall 2022] Enlist the sources of sanitary sewage. A city with a population of 100,000 has an area of 100 hectares. Find the ratio of DWF and WWF for the sewer line: rate of water supply = 110 lpcd; average runoff coefficient = 0.52; time of concentration = 50 min; assume 80% of water supplied reaches the sewer. Comment on your result.

9. [Spring 2023] Define time of concentration. Calculate the design discharge for a sewer: projected population = 100,000; area = 9 sq.km; rate of water supply = 112 lpcd; permeability factor = 60%; rainfall duration = 15 min; time of flow = 15 min; time of entry = 5 min. Assume 85% of supplied water is converted to wastewater and maximum demand is 3 times the average demand.

10. [Fall 2024] Calculate the quantity of wastewater generated during a storm for separate, combined and partially-separated sewage systems, assuming an average rainfall depth of 20 cm over 4 hours, for the given catchment area, storm duration 40 minutes.

Surface data — Roof 25% (C=0.90); Road 12% (C=0.85); Park/Garden/Lawns 30% (C=0.20); Yard 15% (C=0.70); Vacant Plots 18% (C=0.12).

11. [Fall 2022] Explain the objectives of solid waste management. Suggest an appropriate solid waste management approach for Pokhara, with justification.

12. [Spring 2023] As a member of the development planning commission for your city, the mayor seeks your recommendations to improve the existing solid waste management system. Provide a comprehensive plan outlining the key strategies you would suggest.

13. [Spring 2021] As a member of the development planning commission of Kathmandu Metropolitan City, what suggestions would you give the mayor for solid waste management?

14. [Fall 2021] Describe incineration as a method of solid waste disposal, with its merits and demerits.

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Sanitary landfill

●       Solid waste management practices

Unit II: Quality of Wastewater

Constituents & properties · decomposition · BOD/COD · sampling · population equivalent

1. [Spring 2020] Write about BOD and its significance in wastewater treatment. How is it determined in the laboratory for domestic sewage? A test is conducted to find the relative stability at 37°C; the incubation period to decolourise the mixture at that temperature is 8 days. Calculate the relative stability of the sample.

2. [Spring 2020] What do you understand by population equivalent? How do you determine it? A main combined sewer serves an area of 12 sq.km with a population density of 250 persons/hectare. Average wastewater flow = 85 lpcd; peak flow is 80% in excess of average, together with a rainfall equivalent of 40 mm in 24 hrs (70% runoff). Calculate the capacity and size of the combined sewer (max. velocity 2.8 m/sec).

3. [Fall 2021] What do you mean by sampling of wastewater? Determine the 2-day BOD at 20°C for a sewage having a 5-day BOD at 20°C of 180 ppm (base-10 rate constant = 0.1/day).

4. [Spring 2021] Differentiate between BOD and COD. With a sketch, explain how nitrogenous organic matter changes from one form to another.

5. [Spring 2021] If the 5-day BOD at 20°C is 280 mg/l and the 1-day BOD at 25°C is 111.80 mg/l, calculate the rate reaction constant 'k' at 20°C and the 7-day BOD at 25°C.

6. [Fall 2022] Explain the sampling procedure for sewage. Also explain, in detail, the procedure for finding the BOD of a sewage sample in the laboratory.

7. [Spring 2023] How do you determine the DO of a wastewater sample in the laboratory? Explain with an appropriate example.

8. [Spring 2023] What are the limitations of the BOD test? If the 3-day BOD at 28°C of a sewage sample is 350 mg/lit, what will be its 5-day BOD at 38°C? (K = 0.1/day, base-10, at 20°C).

9. [Fall 2024] What do you understand by wastewater sampling? Calculate the 2-day BOD at 30°C for a sewage with a 5-day BOD of 280 ppm, assuming a base-10 rate constant of 0.1/day at 20°C.

10. [Fall 2024] What are the limitations of the BOD test? How do you determine the BOD of a wastewater sample in the laboratory? Explain in detail.

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Aerobic and anaerobic decomposition

●       Nitrogen and carbon cycles

Unit III: Design and Construction of Sewer

Hydraulics of sewer flow · self-cleaning velocity · sewer materials · sewer appurtenances

1. [Fall 2021] Design a sewer running 0.7 times full at maximum discharge for a city with population 120,000 and per-capita water supply 180 l/day. Design the circular sewer taking N = 0.013, slope = 1/500, peak factor = 2.25 (80% of water supply contributes to sewage).

2. [Spring 2021] If the sewer runs 0.8 times full at maximum discharge, design the circular sewer (N = 0.013, slope = 1 in 600, peak factor = 2.5, 85% of water supply contributes to sewage). Also design a sewer to serve a population of 20,000 with a water supply of 200 lpcd.

3. [Fall 2022] What are the requirements of sewer materials? What hydraulic analyses are carried out for sewer design? Explain.

4. [Fall 2022] Design a sewer running 0.75 times full at maximum discharge for a town of 150,000 persons on a separate system, water supply 250 lpcd, n = 0.013, permissible slope 1 in 500, peak factor 3.

5. [Spring 2023] Find the minimum velocity and gradient required to transport coarse sand particles of 0.8 mm diameter and specific gravity 2.62 through a sewer of 1.5 m diameter (β = 0.1, f = 0.03, sewer running half full, n = 0.012).

6. [Fall 2024] A circular sewer and a rectangular sewer are hydraulically equivalent. Find the relation between the depth of the rectangular sewer and the diameter of the circular sewer, if the width of the rectangular sewer is 2.5 times its depth (rectangular sewer open to atmosphere).

7. [Fall 2024] What do you understand by self-cleaning velocity? Explain its significance in sewer design. Derive Shield's expression for self-cleaning velocity.

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Crown corrosion in sewer pipeline

●       Manhole

●       Requirements of sewer materials

Unit IV: Disposal of Wastewater

Dilution method · self-purification · oxygen sag curve & Streeter–Phelps equation

1. [Spring 2020] Using the given river/wastewater data (flow, DO and BOD for the river and the wastewater; k = 0.12/day, R = 0.40/day), find the DO at the end of 2 days after mixing.

2. [Fall 2021] A town discharges 130 m3/sec of sewage into a river that is 85% saturated with DO and flows at 1600 m3/sec during the lean period (velocity 0.12 m/sec). The 5-day BOD of the sewage is 310 mg/L. Find the critical DO deficit and when/where it occurs downstream (k = 0.11/day, self-purification coefficient f = 4, saturation DO at 20°C = 9.17 mg/lit, ultimate BOD = 130% of 5-day BOD).

3. [Spring 2021] A city discharges 100 cumecs of sewage into a river fully saturated with oxygen, flowing at 1500 cumecs during the lean period (velocity 0.1 m/s). The 5-day BOD of the sewage is 280 mg/lit. Find when and where the maximum DO deficit will occur downstream, and its amount (self-purification coefficient = 4.0, saturation DO at 20°C = 9.2 mg/lit, k = 0.1/day).

4. [Fall 2022] A city discharges 1500 lps of sewage into a stream with a minimum flow of 5000 lps (both at 20°C). The 5-day BOD of the sewage is 180 mg/l and of the river is 2 mg/l. Sewage DO is zero; river DO is 90% of saturation. If the minimum DO to be maintained is 4.5 mg/l, find the degree of sewage treatment required (deoxygenation coefficient 0.1/day, re-oxygenation coefficient 0.3/day, saturation DO at 20°C = 9.17 mg/l).

5. [Spring 2023] A river with fully-saturated DO receives sewage at 120 cumecs; the river flow is 1800 cumecs at a minimum velocity of 0.2 m/s. Find the critical DO deficit and its location (5-day BOD at 25°C = 300 mg/l, coefficient of purification = 0.12/day, ultimate BOD = 380 mg/l).

6. [Fall 2024] Determine the degree of treatment required to maintain a minimum DO of 4 mg/l in a stream when a town discharges 800 lps of sewage (5-day BOD = 250 mg/l) into a stream with minimum flow 4000 lps; river DO is 80% of saturation (K1 = 0.1/day, K2 = 0.3/day, saturation DO at 20°C = 9.17 mg/l).

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Oxygen sag curve

●       Sewage sickness

Unit V: Physical and Chemical Treatment of Wastewater

Treatment layout · screening · skimming/flotation tank · grit chamber · sedimentation

1. [Spring 2020] Design a grit chamber for a treatment plant expecting an average flow of 5000 m3/h of domestic wastewater; determine the effective and overall dimensions. With a neat sketch, describe the purpose and construction of a grit chamber.

2. [Fall 2021] Design a grit chamber for a sewage flow of 50 MLD (specific gravity of grit = 2.65, temperature 28°C, particle size 0.21 mm, specific gravity of organic matter = 1.2, k = 0.06, f = 0.03).

3. [Spring 2021] Why should wastewater be treated? What processes are involved?

4. [Fall 2022] Draw the typical layout of a wastewater treatment plant. Explain the different primary and secondary treatments of wastewater.

5. [Fall 2022] Design a grit chamber for a sewage flow of 55 MLD (specific gravity of grit = 2.65, temperature 27°C, particle size 0.21 mm, specific gravity of organic matter = 1.2, K = 0.06, f = 0.03).

6. [Fall 2024] Design a grit chamber for a wastewater treatment plant for a population of 250,000, flow rate 100 lpcd, specific gravity of grit = 2.65, specific gravity of organic particle = 1.2, particle size 0.2 mm, temperature 20°C, peak factor 2.5.

7. [Fall 2024] How are fats, oil and grease removed from wastewater? Write the design steps for such a unit.

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Purpose and construction of a grit chamber

●       Preliminary treatment units

Unit VI: Biological Treatment of Wastewater

Trickling filter · activated sludge process · oxidation pond

1. [Spring 2020] Write briefly about the biological unit of a wastewater treatment plant, with an example. Calculate the effluent BOD of a two-stage trickling filter (sewage flow 5 MLD, influent BOD in first TF = 350 mg/lit, volume of first filter = 800 m3, volume of second filter = 400 m3, recirculation 1.8 & 1).

2. [Fall 2021] Explain the basic operation involved in the activated sludge process, with the help of a flow diagram.

3. [Fall 2021] Calculate the effluent BOD of a two-stage trickling filter (sewage flow 5 MLD, influent BOD in first stage = 350 mg/lit, volume of first filter = 650 m3, volume of second filter = 400 m3, recirculation ratio of both filters = 2).

4. [Fall 2021] Design an oxidation pond to serve a community removing 90% of influent BOD, population 3500, sewage flow 150 lpcd, permissible organic loading 510 kg/ha/day, influent BOD 250 mg/lit (rate constant 0.1/day).

5. [Spring 2021] Design a high-rate single-stage trickling filter for a town of 40,000 persons: domestic sewage @ 150 lpcd (200 mg/l BOD), industrial wastewater @ 0.25 MLD (600 mg/l BOD), recirculation ratio 1.0, BOD removal in primary clarifier 35%, effluent BOD desired 30 mg/l.

6. [Spring 2021] What is meant by activated sludge? Describe, with a schematic diagram, the treatment of wastewater by the activated sludge process.

7. [Fall 2022] Calculate the diameter required for a single-stage trickling filter to yield an effluent BOD5 of 20 mg/l, treating settled domestic sewage of BOD5 120 mg/l (flow 2200 m3/day, recirculation 4000 m3/day, filter depth 1.5 m).

8. [Spring 2023] Design an oxidation pond for sewage from a population of 4000 @ 160 lpcd (5-day BOD 310 mg/l, organic loading 350 kg/ha/day, width:length 1:2, operational depth 1.25 m).

9. [Spring 2023] Differentiate between attached-growth and suspended-growth processes; mention the various treatment techniques included in each. Also design a high-rate two-stage trickling filter for a town of population 52,000 (domestic sewage @ 165 lpcd, 210 mg/l BOD; industrial sewage @ 0.25 MLD, 790 mg/l BOD; BOD removed in primary clarifier 35%; effluent BOD desired 25 mg/l).

10. [Fall 2024] Design a high-rate two-stage trickling filter for a town of population 52,000 (domestic sewage @ 200 lpcd, 200 mg/l BOD; industrial sewage @ 0.5 MLD, 800 mg/l BOD; BOD removed in primary clarifier 35%; effluent BOD desired 25 mg/l).

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Compare normal-rate and high-rate trickling filters

●       Construction, location and working of an oxidation pond

Unit VII: Treatment of Sludge and Disposal

Sludge sources · thickening · dewatering · digestion · disposal methods

1. [Spring 2020] Differentiate between conventional and high-rate digesters. Explain the effect of temperature and pH on the anaerobic digestion process. Briefly explain dewatering by sludge drying beds and rotary vacuum filtration. Is dewatering of sludge necessary?

2. [Fall 2021] Briefly describe the aerobic and anaerobic sludge digestion processes. Explain the effect of pH and temperature on the digestion process.

3. [Spring 2021] Design a sludge digestion tank from the given data: capacity of sedimentation tank = 800 m3, detention time 2.5 hrs, SS in raw sewage 240 mg/l, W/C in digested sludge 80%, W/C in fresh sludge 93%, specific gravity of sludge 1.04, digestion period 4 months, PST removes 40% SS.

4. [Fall 2022] Why is it necessary to treat sludge? Explain the different sludge-treatment procedures.

5. [Fall 2024] Why does sludge need to be treated? List the methods of sludge treatment. With a sketch, elaborate the gravity thickening process and show the relationship between volume and moisture content.

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       Sludge drying bed

●       Methods of sludge disposal

Unit VIII: Disposal of Wastewater in Unsewered Area

Pit privy, VIP latrine, pour-flush latrine · septic tank · soak pit / drain field

1. [Spring 2020] What modification was made in the VIP latrine compared to the pit latrine? Is a septic tank an on-site or off-site sanitation option? Explain. Design a septic tank for a house with your family's number of members (sewage rate 100 lpcd, sludge cleaned once in 2 years); if the percolation rate is 40 min/cm, design the drain field / soak pit (GWT 4.5 m below ground).

2. [Fall 2021] Design a septic tank for 15 users (sewage flow 105 lpcd, sludge cleaned once in 3 years, percolation rate 30 min/cm); design the drain field / soak pit (GWT below 5 m).

3. [Spring 2021] Design a septic tank and soak pit for a household of 8 persons (sewage generation 100 l/person/day, septic tank cleaned once in 3 years, soil infiltration rate 50 l/m2/day).

4. [Fall 2022] Design a septic tank for a hostel: 150 users, peak discharge 200 lpcd, desludging period 1 year, percolation rate 20 min/cm.

5. [Spring 2023] Design a septic tank for a small colony of 350 persons, average daily sewage flow 180 l/head, detention period 1.5 days, cleaning interval 6 months.

6. [Fall 2024] Design a septic tank and soak pit for a household of 20 persons (150 l/person/day, retention time 24 hrs, cleaning period 3 years, soil infiltration rate 400 l/m2/day).

Short notes commonly asked from this unit (attempt any two, 2×5 marks — typical pattern):

●       VIP latrine

●       Leaching cesspool

●       Design considerations of a septic tank

Post a Comment